modernization of central oR and radiology department

Over a three-year renovation period, the existing central OR and radiology department were completely redesigned while remaining in operation. The central operating theatre in the listed Building 1 at MKH has nine ORs, six of which have been renovated and four of which are equipped with a fully integrated video management system (Olympus Endo-Alpha). The ORs are connected to downstream preparation areas with direct sterile corridor access and a central induction area. The complexity of the project required implementation in three major construction phases, which meant that cost-intensive temporary solutions were not necessary during the construction period. Structural upgrades were also carried out on the floors below during ongoing operations. This was made possible by HENKE + PARTNER's contact point management. The entire project was completed without the need for costly enclosure of the construction site.

The completion was achieved within budget and on schedule.

The project was funded by public resources.
Cover Image: Jost Fink

Neubau Zentral-OP Marienkrankenhaus
Neubau Zentral-OP Marienkrankenhaus

Image 1: Hauke Müller
Image 2: Jost Fink
Image 3: HENKE + PARTNER